Business Type: Manufacturer
Main Products:water purifierwater filterAir Purifier UF membrane RO membrane
ID:2004091348
Category: Smart Home & Security Home Appliances
MOQ:200.00 Set(s)
water purifier
L/CT/TWesstern UnionOthers
Model number: | HM-ROF-01 | Purified water capacity | 50 Gallon / Day |
Gross weight: | 4kgs | Water pressure: | 0.1-0.3MPa |
Type: | Reverse Osmosis | Purified water capacity | 50 Gallon/Day |
Capacity | 50GPD RO membrane | Pressure tank: | 3.2G plastic |
Material: | Food grade pp | Power: | 24V 1.5A |
Water purification method:5umPP+GAC+CTO+RO+T33 | |||
MOQ: 1 Set.
Payment terms: L/C.T/T.Western union.
We can accept OEM or ODM.
Ro Water Filter Equipment
Product Note
1. The product should be promptly closed if there is leaking water;
2. In a timely manner, We recommend user to replace the filter according to replacement cycle;
3. When the water suddenly becomes considerably larger flow, Please do not drink the water;
4. Please do not customize repair or alter the product;
5. When moving the product, please do not pull the PE pipe to prevent leakage;
6. When the product is not used for a long time, turn off the water supply, power supply;
7. Do not use the rated voltage power that disproportionate;
8. After first time use it or a short time (within 1 month), when start to use itm, first two tanks of produced water should be drained; after long-term (over 1 month) stopped use it, when start to use again, should replacement activated carbon filter;
9. Use detergent to scrub it, please do not to use gasoline, alcohol and other solvents to scrub it.
Installation Note:
1. Do not install under sunlight;
2. The product working temperature 5 to 45 degrees;
3. The product can not filter hot water, please do not connect to water heater.
4. Before use it, installation of the product should be fixed to prevent product
turn down;
5. If the tap water pressue is higher than 0.4Mpa, please install the pressue
limiting valve before the product;
6. Do not arbitrarily remove the parts on the product, to prevent leakage and damage
to the machine;
7. PE pipe and fittings should installed in place;
8. Water tee, no seals should be wrapped with raw materials, there is a ring of raw
materials can not be wrapped around the band;
9. After the installation is completed, you should turn on the water and gooseneck
faucet, after 5 minutes, close gooseneck faucet , and check there leaks;
10. Pure water end and wastewater end can not be inversely connected.
Business Type:Manufacturer
Online Supplier