ID:2005134022
Construction & Decoration Building Structural Material
MOQ:50.00 Square Meter(s)
aluminium formworkFormworkformsconcrete formwork
L/CT/TOthers
If you ask me, what's the Most important thing in the world?
Developer and main contractor will tell you the Truth.
With the rapid development of economy, Time and Energy becomes particular important.
However, GETO Aluminium Formwork System save time and energy for you.
After that, you have more valuable time and energy to accompany with your family and friends.
Providing one-stop service, GETO Aluminium Formwork let you more assured and comfortable.



Aluminium Formwork Benefits
| Items | Aluminium formwork |
| 1. Material | Aluminium alloy 6061-T6 |
| 2.Installation | After short period of training, workers can easily learn to install and dismantle the formwork. |
| 3.Construction period | 3-5 days per storey. |
| 4.Machine assistance | Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used, such as: 1) Shifting of reinforcing steel rebar into assembly point 2) Removing debris from site 3) Loading and Unloading materials from trucks into site storage area. |
| 5.Quality of formwork | The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won’t be wasted. |
| 6.Plastering cost | As the smooth effect after removing the formwork, there is no need to plaster. |
| 7.Formwork stability | The load capacity is 60 KN per square meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting. |
| 8.Scrap value | The scrap value is about 50% of the new panel. |

GETO is a comprehensive joint-stock company specialized in Aluminium Formwork and scaffolding system. Headquarters registered in Jiangxi and the global operation management center is based in Tsui Hang New District, heart of Guangdong-Hong Kong-Macao Greater Bay Area. We had set up more than 20 subsidiaries in Beijing, Shanghai, Shenzhen, Changsha, and overseas in Singapore, Malaysia, Cambodia, India, UAE, Panama, Algeria. The products are sold well in over 30 countries and regions. With four domestic production bases, covering 200,000 square meters in Jiangxi, 340,000 square meters in Hubei, 270,000 square meters in Guangdong, 270,000 square meters in Shandong, and one in Malaysia, we are one of the first specially qualified and national high-tech enterprises. With a backbone team of over 2,000 people, we are taking the lead in the realization of scale, specialization, and modernization, focusing on formwork system R&D, production, leasing, sale, renovation, and technical services, providing customers with a full range of high-quality services.


If clients require, GETO can provide field specialists to project site for guidance within one month without charge, meanwhile, GETO will invite clients' site supervisors and workers to factory for learning and training.

Project case

After dismantling aluminum formwork, it can control flatness and verticality
in less than 5mm the wall surface is very smooth, one-time pouring
molding, without plastering and second work, saving construction time, energy as well as cost.


1. Your inquiry related to our product & price will be replied within 24hours.
2. Well-trained & experienced staff are to answer all your inquiries professional in English of course.
3. Working time: 8:00am - 18:30pm, Monday to Saturday.
4. OEM is highly welcomed. We have a strong R&D team here to help.
5. Your business relationship with us will be confidential to any third party.
6. Good after-sale service offered, please get back if you got any questions.
7. Mockup/pre-assembled in the factory before delivery. Thus we can avoid some mistakes in advance and correct them.

GETO takes each opportunity to expand the business to the world, and bring our products and new technology, providing the best after-serve and create the biggest value and benefits to our clients. We attended an oversea exhibition fair every year, in order to let more and more clients to save construction costs and do service for them.

Standard export carton packing.
Within 5-20 days after confirming the order, a detailed delivery date should be decided according to different projects and order quantity.

Yes, there are nearly 70% of standard panels can be common reused.
-Q-: Are you a manufacturer or trader?
A: GETO is the manufacturer of aluminum formwork system for 9 years. Our group has 4 factories, cove raged every scaffolding systems.
-Q-: If I don't have construction crew knew well about your formwork system, what can I do?
Well, we will send one or two field specialists to your construction site for guidance if you require it.
-Q-: How to proceed with an order for aluminum formwork?
1- Please provide completed project drawings to us.
2- GETO design engineer will work out a formwork solution base on project drawings, we have a meeting to discuss the details solution.
3- Construction details confirmed, sign the sales contract, receiving the deposit.
4- To work out shell drawings and modulation drawings.
5- Have a meeting for confirming model details.
6- Production.
7- Acceptance and check.
8- Shipping.
How to contact us?


Business Type:Manufacturer
Online Supplier