ABO BUILDING MATERIALS KUNSHAN CO.,LTD.

Online Supplier

Business Type: Manufacturer

Main Products:Wire Drawing MachinesWire weleded mesh machineExpanded metal mesh machineTube millChain link fence machineRib lathMetal lathCorner beadGabion mesh making machineRazor barbed machine

20P101 Hi-rib lath production line, high speed hi-Rib lath production line

ID:2006189154

Category: Manufacturing & Processing Machinery General Industrial Equipment

FOB Price:US$ 80000.000 / Set(s)

MOQ:1.00 Set(s)

Product Keywords:

Hi-rib lath production linemetal lath production line

Payment Method:

L/CT/T

Product Category
Manufacturing & Processing Machinery > General Industrial Equipment
Trademark
Product Package
Specification
Place of Origin
Port
Shanghai
Product Description

Description:

The Hi-rib lath machine is used to produce the hi-rib lath which is applied to plaster and reinforcing the wall.

Hi-rib lath (High Ribbed Lath/High Ribbed Formwork) is manufactured from hot-dipped galvanized steel sheets. It has been applied to the concrete structure of projects all over the world. As early as 1969, it has tested and verified by British Cement Association of and many architecture-structure experts in ESPM that it is superior over traditional template including wooden template, steel template etc.

Hy-rib lath is manufactured from Pre-galvanized steel according to BSEN 10327 as well as stainless steeI to BSEN 10088-2 type 1.4301 .

 

Working process:

 Decoil → Punching → expanding and shearing → Rib lath feed out.

 

Key benefits of Hy-Rib:

1. Achieves significant reductions in the concrete pressure normally associated with conventional

formwork.

2. It can be installed quicker than plywood or steel formwork.

3. can be placed before rod reinforcement which is then installed by piercing through the mesh area.

4. Eliminating preparation of the joint surface.

5. Allowing a high rate of rise of concrete.

6. Enables the pour to be visually monitored

7. Reducing the risk of voids and honeycombing

8. Save time - it is left in place so formwork stripping is eliminated - only the supports are removed.

9. Hy-Rib can be supported by existing or extra reinforcement. The whole structure can be left in the concrete which eliminates the placing and removal of temporary supports.

10. No need to clean, reface and oil formwork

20P101-alibaba-

 

 

Specification

20P101-alibaba-Spe

Note:

All dimensions can be adjusted according to the customer requirements.

 

Application: It is mostly used as concrete permanent dismantle free template for civil engineering such as tunnel, bridge, raft-style foundation, sewer system, subways, retaining wall, nuclear power station, docks, storing tanks, skyscrapers, ocean engineering and irregular or curved shapes. Because its meshes and U patterns, it has better anti-stress capability and forming flexibility than normal metal lath.

 

Installation:

Hi-rib lath is ideal for refurbishing damaged or aged masonry walls, when a key for rendering is not certain due to disintegration or softening of the wall face.

Lath should be fixed with apexes of ribs against the wall, edge ribs of sheets nesting into each other should be wire-tied every 15cm and ends of sheets should be lapped not less than 2.5cm and nesting ribs securely tied together.

Stainless steel fixings should be used at sufficient intervals to hold the lath firmly in position.

20P101-alibaba-Ins

 

De-coiler:

20P101-alibaba-

 

Main Punching Machine

20P101-alibaba-

 

 Lath profiling and cutting machine

20P101-alibaba-

 

Collecting Table 

20P101-alibaba- 

Automatic Electric Controller for the full line

SN

Name

Parameter

1

Control method

PLC

2

Electric element

Shneider

 

Finished product -  Hi-rib lath

20P101-alibaba-120P101-alibaba-2

Packaging & Shipping

1 

Our Services
 
banner01
Warranty
Within the limits of what hereinafter set forth, ANBER undertakes to remedy all defects of the equipment attributable to its engineering, material and workmanship. Such obligation of ANBER is limited to defects that show within 12 (twelve) months from the delivery of the equipment. 
To benefit from these rights, Buyer shall notify within 8 days of its discovery to ANBER, in writing, analytically and precisely, all shown defects.

Installation and commissioning
Machine is installed and commissioned by ANBER technicians. Testing cost, travel, accommodation and meal expenses are payable by the customer, the customer will provide local engineers and staff to support the installation. 
Company Information

+wangzhan_14

                                                   .png

                                    Scan with wechat                      Our website
 

Add: No. 525, Jindong road, Jinxi town, Kunshan, China
Tel: (+86)-510-88239310/88239309
Fax: (+86)-510-88237950
Web: www.china-anbermachine.com

 

 

FAQ

1. How long will your engineer reach our factory?

Within one week after machine arrival your factory.

 

2. How many days will you finish installing ?

Normally we will finish installation and training within 7 days. Machine installation only need 1-2 days. The left time just training your workers.

 

3. What should we charge for your engineer?

You should charge for the air tickets, hotel, food and also their salary 100USD one day per person.

 

4. How long is your machine's warranty period?

All our machine have one year guarantee, starting from the machine finished installation.

 

5. How could we do after one year warranty period?

We can also do service for you, but you need pay for spare parts and engineer's cost.

 

6. How could we do if the parts broken within warranty?

We would express the free replacement parts during the warranty date.

 

7. Does your engineer understand English?

Our engineer understand a little English. All our engineer have more than five years machine installation experience. In addition, they can use body language to communicate with customer.

 

8. How do we solve the machine problem after your engineer leaving?

Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according your description.

 

9. How many worker do we need running those machines?

One or two workers required for machine operation, there will be only one worker for our micro type expanded metal mesh machine within 25T punching force otherwise need two workers for hevay duty expanded metal machine.


ABO BUILDING MATERIALS KUNSHAN CO.,LTD.

Business Type:Manufacturer