ABO BUILDING MATERIALS KUNSHAN CO.,LTD.

Online Supplier

Business Type: Manufacturer

Main Products:Wire Drawing MachinesWire weleded mesh machineExpanded metal mesh machineTube millChain link fence machineRib lathMetal lathCorner beadGabion mesh making machineRazor barbed machine

20P112 3-16mm Wire Pointing Machine, tip rolling machine, steel wire tip rolling machine

ID:2006189206

Category: Manufacturing & Processing Machinery General Industrial Equipment

FOB Price:US$ 1900.000 / Set(s)

MOQ:1.00 Set(s)

Product Keywords:

Wire pointing machinetip rolling machinesteel wire pointing machine

Payment Method:

L/CT/T

Product Category
Manufacturing & Processing Machinery > General Industrial Equipment
Trademark
Product Package
Specification
Place of Origin
Port
Shanghai
Product Description

 

Description of tip rolling machine:

The tip rolling machine is an indispensable auxiliary equipment for steel wire drawing line. Its function is to thin the head of the wire according to the aperture of the drawing die, so as to pass through the drawing die for drawing processing. It is suitable for high, medium and low carbon steel wire and other nonferrous metal wire. It has the characteristics of beautiful appearance, compact structure, high efficiency and good performance.

The wire pointing machine is composed of base, reduction gear box, motor, coupling, matching gear and upper and lower rollers.

 

Main technical parameters:

Min wire diameter: ?3.0 mm

Max. Wire diameter: ?16.0 mm

Diameter of roller: ?120mm

Length of roller: 250mm

Rotation speed of roller: 39 r/min

Groove of roller: 10 pcs

Strength of raw material: ≤100kg/mm

Length for once rolling: about 120mm

Motor power: 5.5KW

 

Photos

20P112(3-16mm)-alibaba-2

Steel wire pointing machine 

 

20P112(3-16mm)-alibaba-1

Tip rolling machine 

 

Contact us

 

 

Packaging & Shipping

1 

Our Services
 
banner01
Warranty
Within the limits of what hereinafter set forth, ANBER undertakes to remedy all defects of the equipment attributable to its engineering, material and workmanship. Such obligation of ANBER is limited to defects that show within 12 (twelve) months from the delivery of the equipment. 
To benefit from these rights, Buyer shall notify within 8 days of its discovery to ANBER, in writing, analytically and precisely, all shown defects.

Installation and commissioning
Machine is installed and commissioned by ANBER technicians. Testing cost, travel, accommodation and meal expenses are payable by the customer, the customer will provide local engineers and staff to support the installation. 
ABO- EXHIBITION

From 2013, we ABO have attend many fairs, like 

"IBS&KBIS 2016" in Las Vegas, 2016 BIG5 in Dubai, we will attend annual fair to show our new type.

Here is the fair show.

.jpg 

ABO-CERTIFICATE

For metal beads and lath, we ABO have got many certificate,

1, rib lath sliting device patent,

2, multi angle beads slitting and rollforming patent,

3, Architrave beads patent,

4, Hi-tech enterprise cartificate

5, chinese industry-academy-research reward

.jpg 

Company Information

+wangzhan_14

                                                   .png

                                    Scan with wechat                      Our website
 

Add: No. 525, Jindong road, Jinxi town, Kunshan, China
Tel: (+86)-510-88239310/88239309
Fax: (+86)-510-88237950
Web: www.china-anbermachine.com

 

 

FAQ

1. How long will your engineer reach our factory?

Within one week after machine arrival your factory.

 

2. How many days will you finish installing ?

Normally we will finish installation and training within 7 days. Machine installation only need 1-2 days. The left time just training your workers.

 

3. What should we charge for your engineer?

You should charge for the air tickets, hotel, food and also their salary 100USD one day per person.

 

4. How long is your machine's warranty period?

All our machine have one year guarantee, starting from the machine finished installation.

 

5. How could we do after one year warranty period?

We can also do service for you, but you need pay for spare parts and engineer's cost.

 

6. How could we do if the parts broken within warranty?

We would express the free replacement parts during the warranty date.

 

7. Does your engineer understand English?

Our engineer understand a little English. All our engineer have more than five years machine installation experience. In addition, they can use body language to communicate with customer.

 

8. How do we solve the machine problem after your engineer leaving?

Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according your description.

 

9. How many worker do we need running those machines?

One or two workers required for machine operation, there will be only one worker for our micro type expanded metal mesh machine within 25T punching force otherwise need two workers for hevay duty expanded metal machine.


ABO BUILDING MATERIALS KUNSHAN CO.,LTD.

Business Type:Manufacturer

Online Supplier