ID:2006199399
Category: Manufacturing & Processing Machinery General Industrial Equipment
MOQ:1.00 Set(s)
steel coil decoilerand levelerRoller type decoilingleveling machinedecoiling
L/CT/T




1) The uncoiling conveying roller mechanism adopts a two-roller structure, and the spacing of the two idler rollers is adjusted according to the diameter of the coiled material, the coiling is carried out by the two rollers, and the rotating roller is used to realize the unwinding and discharging of the winding material;
2) The leveling mechanism adopts a 5-roller plus 2-roller structure, that is, the leveling roller is fed by the upper 2 lower 3 plus the lower roller, and the spacing between the upper pressing roller and the lower roller is adjusted according to the thickness of the winding material, and the upper and lower pressing rollers are arranged. The sheet material, the rotating pressure roller drives the sheet material to continuously pass, thereby achieving the leveling of the sheet material;
Main technical parameters:
Loading weight: ≤15 tons
Outer diameter: 450~1250mm
Width: ≤1700mm
Feeding roller diameter: 200mm
Leveling roller diameter: 125mm
Speed of decoiling: 2.5 RPM
Motor(reducer) power: 5.5kw/4P
Main drive: chain
Overall size(L-W-H): 3000-2350-1400mm
Weight: 2100KG


From 2013, we ABO have attend many fairs, like
"IBS&KBIS 2016" in Las Vegas, 2016 BIG5 in Dubai, we will attend annual fair to show our new type.
Here is the fair show.
For metal beads and lath, we ABO have got many certificate,
1, rib lath sliting device patent,
2, multi angle beads slitting and rollforming patent,
3, Architrave beads patent,
4, Hi-tech enterprise cartificate
5, chinese industry-academy-research reward



Scan with wechat Our website
Add: No. 525, Jindong road, Jinxi town, Kunshan, China
Tel: (+86)-510-88239310/88239309
Fax: (+86)-510-88237950
Web: www.china-anbermachine.com
1. How long will your engineer reach our factory?
Within one week after machine arrival your factory.
2. How many days will you finish installing ?
Normally we will finish installation and training within 7 days. Machine installation only need 1-2 days. The left time just training your workers.
3. What should we charge for your engineer?
You should charge for the air tickets, hotel, food and also their salary 100USD one day per person.
4. How long is your machine's warranty period?
All our machine have one year guarantee, starting from the machine finished installation.
5. How could we do after one year warranty period?
We can also do service for you, but you need pay for spare parts and engineer's cost.
6. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
7. Does your engineer understand English?
Our engineer understand a little English. All our engineer have more than five years machine installation experience. In addition, they can use body language to communicate with customer.
8. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according your description.
9. How many worker do we need running those machines?
One or two workers required for machine operation, there will be only one worker for our micro type expanded metal mesh machine within 25T punching force otherwise need two workers for hevay duty expanded metal machine.

Business Type:Manufacturer
Online Supplier