Business Type: Manufacturer
Main Products:food thermometerkitchen thermometer meat thermometerBBQ thermometer cooking thermometeroven thermometergrill thermometerKitchen Timerscountdown timermechanical digital timer
ID:20081317347
Daily Use & Light Industry Kitchen Tools & Gadgets
MOQ:3000.00 Piece(s)
kitchen timer cooking timer mechanical timer countdown timer count down timer plastic timer ABS timer
L/CT/T
| Item Number: | T901 |
Shape: | Chicken | |
Item Size: | 14x7.3x14.5cm | |
Material: | Plastic ABS | |
Counting time: | 0-60 minutes | |
Color: | Any color or logo printing | |
Package: | 1pc/PE bag, then in white box,100pcs/ctn | |
Carton Size: | 57.5*45.5*31cm/48pcs | |
CBM/Ctn: | 0.0811 | |
G.W./N.W.: | 6.5/5.0kgs | |
Certificate: | ROHS | |
MOQ: | 2000pcs | |
Description: | 60 minutes sound imatating chicken mechnical timer |
Product show:


Similar products:

Features:
1. Count-down time: 0-60 minutes;
2. Clear and aloud alarm sound;
3. Accuracy: +/-3 minutes(60 minutes)
4. Apply to houseware use;
Using Instruction:
1. Turn the dial to 60 clockwise;
2. Bring it back to the number of minutes you want.When all the minutes have elapsed, the bell will ring loundly and clearly.
Q1: How to get quotation?
Please send us an inquiry with all requires (including picture, quantity, color, Logo, package), or we can do some products recommendation. We usually quote within 24 hours after getting inquiry. If you are very urgent to get the price, please advise us in your email and it will be a priority.
Q2: Can I get a sample to check quality?
After price confirmed, we offer samples to check quality. If you don’t have account, please send the samples fee and the freight to us. The sample charge will be deducted from the cost of the order.
Q3: What kind of files do you accept for printing?
PDF, AI, Core Draw, high resolution JPG
Q4: How long can I expect to get the sample?
Lead time for custom sampling about 7-10 days, samples will be sent to you via express and arrive in 3-5 days.
Q5: What about the lead time for mass production?
The lead time of MOQ is about 40 to 45 days. Generally speaking, we suggest that you start inquiry two months before the date you would like to get the products at your country.
Business Type:Manufacturer
Online Supplier