Entegre Harc Inc.

Online Supplier

Business Type: Manufacturer

Main Products:Gypsum PlastersPlasterboardsGypsum PowderCement Plasters MortarCeramic AdhesiveScreedEpoxy Floor CoatingCeramic Tile AdhesivesWaterproofing Material

SUTOP CIFT ELASTIK- Cement and Acryllic-Based Double Component Elastic Water Insulation Material

ID:20092122327

Category: Construction & Decoration Building Structural Material

FOB Price:US$ 1.000 / 20' Container

MOQ:1.00 20' Container

Product Keywords:

Water Insulation

Payment Method:

L/CT/TD/P

Product Category
Construction & Decoration > Building Structural Material
Trademark
Product Package
25 kg polyethylene-reinforced kraft paper bags, B Component: 10 kg’l?k plastic drums (delivered in pallets or as sling-bags upon request.)
Specification
Water Vapour Permeability Class I Shear Tensile Adhesive Strength With no traffic load / Flexible Class of Reaction To Fire E Adhesive Strength, N/mm2 ≥1 Capillary Water Absorption, (kg/m2h0.5) Max 0,1 Crack Bridging Ability, mm > 0,75
Place of Origin
Turkey
Port
Istanbul


SURFACE PREPARATION  

  • The surface of application shall be free solid, clean, free of dust and level.
  • The surface shall always be free of materials such as form oil, paint, dust etc., and shall be fully cured. 
  • Parts on the surface (iron, wood, etc.) shall be removed and these hole shall be filled with appropriate Entegre Repair Mortars. 
  • You may advance to application after dampening the surface.

PREPARATION of the MORTAR  

  • A proper amount of fluid component shall be put inside the mixing vessel (10 kg of fluid/25 kg of powder). 
  • Whole bag is poured to the vessel, and stirred with hand mixer until the lumps are removed. 
  • After resting for 5 minutes, the mortar shall be stirred again. 
  • ENTEGRE CHAMFERING TAPE shall be applied to the connection points of the application surfaces using EPODOL?. 
  • If you do not prefer chamfering tapes, bring the connection points to an oval form and reinforce them with nets.
  • Fluid mortar shall be applied with a brush or a roll. 
  • Second coat shall be perpendicular to the first coat and shall be applied at least for 6 hours later.
  • Wait 3 days for application of final coat (ceramic, screed and cement-based plaster), and take care to prevent mechanical damage to the insulation material during coating.
  • If the application area is a water tank, wait at least 28 days for the curing of the product.
 

CONSUMPTION

1.5-2.0 kg/per m2 for single coat

(Under proper surface and ambient conditions.

It may differ as per surface specifications and application conditions.)

Entegre Harc Inc.

Business Type:Manufacturer

Online Supplier