
Business Type: Manufacturer
Main Products:steel propsScaffoldingssteel plankLadder & Scaffolding PartsSteel PipesPPGI
ID:20110633318
Category: Construction & Decoration Hardware
MOQ:1000.00 Piece(s)
aluminium formwork accessoriesconcrete formwork accessories flat wall tieformwork formwork stub pinformwork wedge pinTie Rodswing nutsanchor nuts Shutters
L/CT/TWestern UnionPaypalMoney GramOthers



| Product name | Concrete construction aluminum formwork accessories formwork panel wedge pin /stub pin shuttering short/long pin |
| Material | carbon steel |
| Finshing | zinc plated/ black/ plain |
| Size | 16*52mm or other size as client's request |
| Grade | 4.8 |
| Application | Concrete Formwork |
| pin pin thickness | 3.0/3.5mm |
| Package | bag+pallet |






Production process:

In bag+pallet to 20 ft or 40 ft container
concrete scaffolding formwork tie rod Nut Wing nut bolt nut
Products Details
| Products name | concrete scaffolding formwork tie rod Nut Wing nut bolt nut |
| Material | Ductile Cast Iron |
| Standard | EN74 / BS1139 / AS1576 |
| Screw size | 12/15/17/22mm |
| unit weight | 0.28-1.3kgs |
| plate diameter | 50-130mm |
| tensile force | 180KN |
| Surface | Galvanzied/black |
| Packing | bags and box or pallets |
| Application | Concrete Formwork Construction |
| MOQ | No MOQ if we have stock |
| Lead time | 10-15 days after confirm deposit |
| Production Capacity | 1000000 pcs /month |
| Contact Person | Lillian-Whatsapp:0086 18602630481 |














- - - 1. Q: What's your MOQ(minimum order quantity)?
A: No MOQ if we have stock.
- - - 2. Q: What's your packing methods?
A: Packed in bag or bulk (customed is accepted).
- - - 3. Q: What's your payment terms?
T/T 30% in advance by T/T ,70% will be before shipment under FOB.
T/T 30% in advance by T/T ,70% against the copy of BL under CIF.
T/T 30% in advance by T/T ,70% LC at sight under CIF.
- - - 4. Q: What's your delivery time?
A: 10-25 days after received the advance payment .
- - - 5. Q: Are you manufacturer or trader?
A: We are the manufacturer of construction materials for decade years ,Tianjin Zhiyi do domestic market and export business.
- - - 6. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing) afforded enough production ability and earlier delivery time.
- - - 7. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
- - - 8. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials.
(1)Adjustable Telescopic Steel Prop,scaffolding steel frame
(2) Scaffolding Pipes (1.5'-2.0')x(0.3-12m), hot dipped galvanized/Pre-galvanized /black. BS1139
(3) steel pipes (ERW steel pipes, Square/ Rectangular tube ,black annealed steel tube)
(4) steel coupler (pressed/drop forged coupler)
(5) Steel Plank With Hooks Or Without Hooks
(6) steel stair case
(7) Screw Adjustable Base Jack,U head jack
(8) Construction Metal Formwork
If there is something I can do for you,feel free to contact us!we are alwayls glad to serve for you !
WECHAT:
Tianjin Zhiyi Metal Products Co.,ltd
Attn:Ms. Lindsay
Mob/Whatsapp/Wechat:+86 -18222966346

Scan and contact us to get latest Price!

Business Type:Manufacturer
Online Supplier