
Business Type: Manufacturer
Main Products:door sealMechanical rubber productsCabinet Rubber SealsSponge rubber sealDoor and window sealSpiral wrapsSilicone RubberMolded Rubber PartsEPDM rubber door sealexhaust rubber hose
ID:20120446584
Category: Manufacturing & Processing Machinery Industrial Processing Machinery
MOQ:500.00 Meter(s)
epdm foam rubber seal strip rubber sealepdm rubber seal
L/CT/TD/PWestern UnionMoney Gram

Product name: | epdm sponge foam sealing strip for automotive door |
Material: | Door seal TPE/PVC /EPDM/Silicone |
Color: | White, Door seal ,other colors can be customized |
Hardness : | 20~80 shore A |
Size: | Door seal can be customize |
Packaging: | Door seal plastic bags inside, carton boxes outside or OEM |
Fecture: | Waterproof,oil resistance,moistureproof,anti-aging,anti-u |
Lead time: | 7-15work days after order confirmed for MOQ |
Brand name | HS | ||
Material | EPDM | ||
Sample | For free | ||
payment | 30%deposit,70% balance before shipping,accept T/T,western union, money gram,L/C,D/A,D/P. | ||
Shipment | by sea,by air,by express,DHL,UPS,TNT and FEDEX | ||
Packaging | Plastic bags inside,carton boxes outside or OEM. | ||
Lead time | 7-15work days after order confirmed for MOQ | ||
Company name | Hebei Weixian Hezhuang Rubber seals Co.,LTD. | ||













Q 1. What's the payment term?
A: We accept T/T 30% deposit and 70% balance against copy of B/L or L/C at sight, West Union,VISA,Paypal is also accepted.
Q 2. What is the normal lead time for product orders?
A: Average lead times for prototype / first article are 1-2 weeks, if tooling is involved, lead time for production tooling is 10 days, average production time after sample approval is 2-3 weeks.
Q 3. What is your standard packing?
A: All the goods will be packed by carton box and loaded with pallets. Special packing method can be
accepted when needed.
Q 4. Could you please tell us the month capacity of your products ?
A: It depends on which model, we produce more than 2000 tons rubber materials per month.
Q 5.How to get a price?
A: Pls make sure your size and qty., if you have drawings or sample,would be much better.
we can also supply special service, such as cut pieces, drill hole, packing, etc. Pls let us know.
Q 6.How long get the goods?
A: We will be responsible to any product damage caused on delivery.
Regards to the delivery, we have the fastest delivery time for this kind rubber, because we have professional production process, usually, it need less than 15 days before deliver the goods.

Business Type:Manufacturer
Online Supplier