
Business Type: Manufacturer
Main Products:door sealMechanical rubber productsCabinet Rubber SealsSponge rubber sealDoor and window sealSpiral wrapsSilicone RubberMolded Rubber PartsEPDM rubber door sealexhaust rubber hose
ID:20120547159
Category: Construction & Decoration Door,Window & Accessories
MOQ:500.00 Piece(s)
wooden door rubber sealrubber door and window sealsEPDM rubber sealdoor and window rubberweather stripD profle 9*69*4
L/CT/TD/PWestern UnionMoney Gram
Features :
1.Resistant to UV;Radiation.
2.Firm and flexible;Easy to assembly.Environmental friendly !
3.Bump preventing;Water&noise proof;Anti-aging;Temperature and Weather resistant .
Specification:
Shape: E,D,P,V, I section shape.
Color: Any color,usually Brown,Grey,Yellow,Black,White,etc.
Brand name | HS |
Supply ability | 10000 meters per day |
Material | EPDM |
MOQ | 1000M |
color | Black brown white gray yellow |
Sample | For free |
payment | 30%deposit,70% balance before shipping,accept T/T,western union, money gram,L/C,D/A,D/P |
Company name | Hebei Weixian Hezhuang Rubber seals Co.,LTD. |









Q1. What's the payment term?
A: We accept T/T 30% deposit and 70% balance against copy of B/L or L/C at sight, West Union,VISA,Paypal is also accepted.
Q 2. What is the normal lead time for product orders?
A: Average lead times for prototype / first article are 1-2 weeks, if tooling is involved, lead time for production tooling is 10 days, average production time after sample approval is 2-3 weeks.
Q 3. What is your standard packing?
A: All the goods will be packed by carton box and loaded with pallets. Special packing method can be accepted when needed.
Q 4. Could you please tell us the month capacity of your products ?
A: It depends on which model, we produce more than 2000 tons rubber materials per month.
Q 5.How to get a price?
A: Pls make sure your size and qty., if you have drawings or sample,would be much better.
we can also supply special service, such as cut pieces, drill hole, packing, etc. Pls let us know.
Q 6.How long get the goods?
A: We will be responsible to any product damage caused on delivery.
Regards to the delivery, we have the fastest delivery time for this kind rubber, because we have professional production process, usually, it need less than 15 days before deliver the goods.

Business Type:Manufacturer
Online Supplier