ID:21060452704
Category: Daily Use & Light Industry Garden Supplies
MOQ:1500.00 Square Meter(s)
football grassArtificial Grass & Sports Flooringsport turf
T/T
Durable 50mm football grass
Pile Height : 50mm
Number of tufts per m2 :10500
STITCH RATE (PER/10CM): 16.7
Yarn weight: 10000 decitex
Gauge: 5/8 inch
Color: Apple green + Field green
Type of fiber: pe
Yarn Shape: S/Fibrillated/Diamond/W/flat
Yarns thread: PE Monofilament straight fiber
Back Material:PP cloth+ Grid+ SBR latex
Water permeability: goood
Anti UV: good
Pulling Force of Tufts> 45N
Wear rate <to 2%
Velvet weight> 1400g
Surface Mass <2,50g/m2
Package:
In roll
Widths: 2m, 4m
Length: 35m,51m,71m
Weight per sqm: 2.2~2.5kg
Install accessories: silica sand, rubber granule, shock pad,joining tape, install glue
Application: Outdoor football field, gym soccer field, futsal/sevens football ground,futnet,net type football
Warranty: 5-8 years
Sample size: 30cm*30cm, 20cm*20cm, 20cm*30cm, other size
According to the basic requirements for the use of the site, the foundation shall be cement concrete foundation or 10% cement stone powder foundation layer. After curing and meeting the requirements, artificial turf shall be laid. The main construction scheme is as follows:
1. Check whether the foundation density and flatness of the whole lawn meet the requirements, and then start to spread the artificial lawn.
2、The whole field shall be measured and laid out, the position of the court line shall be determined and marked, and the laying direction and position of artificial grass shall be determined with different colors of ink.
3、 Start to lay the artificial lawn: The products with marks shall be equipped with the splicing belt at the junction surface and fixed on the ground with special lawn adhesive. The junction area needs to hand over and overlap the 10 marks.
4、Apply glue on the interface. Before the glue dries, lay the cut lawn flat and combine, so that each pair of artificial turf can be closely combined.
5、After laying is completed, need to carefully check whether the bonding of each joint area is smooth, whether the bonding of artificial grass is firm, after checking whether all meet the requirements, can carry out the construction of the next procedure.
6、 Cut off the green artificial grass at the place where the white line needs to be inserted, insert the connecting belt, and apply glue on it. Then insert the cut white artificial grass court line into the position of the court line marked before the paving to bond with the splicing belt. 7、 Sprinkle with quartz sand and colloidal particles as required by the site.If you need to sprinkle quartz sand, put quartz sand or fill colloidal particles into the granulator, push the granulator to carry out quartz sand or fill colloidal particles into the artificial lawn surface, the brush behind the granulator will smooth the quartz sand or fill colloidal particles, and make the quartz sand or black colloidal particles fall fully.
8、Push the speed of the granulator to be uniform, not too Urgent also cannot too slow, ability thickness is even.
9、Quartz sand or filled colloidal particles should be checked after layingDo not smooth and adequate, insufficient areas should be considered to complement, shopAny impurity found in the shipment should be removed immediately to ensure thatQuality.
10、The quartz sand or colloidal particles in the pavement should be kept dry.Facilitate the mobile paving of quartz sand or colloidal particles.Quartz sand orAfter cementation shop outfit is finished also can use hard wool brush or lightLoad towed heavy brush, back and forth brush to make the quartz sand underFully compacted
11、Check and exit after laying.