ID:22092283446
Category: Construction & Decoration Elevators,Ladders & Framework
MOQ:1.00 Piece(s)
EscalatorsEscalator PartsMoving WalksCompetitive EscalatorPassenger Escalator
L/CT/TOthers

| Angle of inclination | 30°,35° |
| Stpe width | 600mm,800mm,1000mm |
| Speed | 0.5m/s |
| Type | Indoor, outdoor |
| Drive type | VVVF |
| Gear box | FYJ160 |
| Arrangement plan | Single, Interrupted,Crisscross |
| Seneor Method | Slow - Stop |


30 ° Escalator Construction Parameter 35 ° Escalator Construction Parameter


Step Chain Entrance Armresr Skirting Brush Fault Monitor
Direction Indication Automatic Start And Stop Skirting Lighting Step Warning Lights

Colors Of Handrail And Baseboard













Q1.Why choose us?
A1. XIZIXIAO (GOTS) Elevator is a joint-stock enterprise integrating elevator R & D, design, production,
sales, installation and maintenance.
Famous brand, already be confirmed by many customers Domestic and overseas Sample projects are customers voice for our quality. Q2: What advantages do you have?
A2:The intelligent production line , from feeding to bending, to enter the roll line turnover work, and at
the same time, enters the stiffener, head, gluing and arc welding process. These technology could guarantee
the machine accuracy.
Q3. What information is absolutely needed before asking for price? A3: 1. How many persons? ( 6 persons for 450kg,8 persons for 630kg, 10 persons for 800kg etc..) 2. How many floors/ stops/ doors? 3. What's the shaft size? (width by depth) 4. Is there a machine room on the top of shaft? Q4. How can we guarantee the good quality of your products?
A4 In during the production process we will inspect all purchased and produced parts and take a record after
put in crates, before shipping out we will do the final inspection and mockup the cabin and sling set, this part
take photo and video as record to make customer being at ease.
Q5: WHAT'S THE PAYMENT TERM? A5 30% in advance, 70% after customers inspection, before loading Q6. What about the packaging?
A6: All elevator parts will be packed into solid wooden cases. Some parts will be wrapped by the film so that
guarantee the machinery part not be destroyed after long time transportation.
Q7. How to do with the elevator installation and maintenance?
A7: We can send engineers to guide the installation and then train the workers about maintenance in the future.
But in most situations, local workers can finish this work with our guidebooks and technology support, or you
can ask the local professional elevator engineers to do this job, This can save much money for our customer.
Of course, you can get support from our factory at any time.
Q8 . What's your guarantee time? A8; We can provide 12months guarantee period, during this time, we will send free

Business Type:Manufacturer
Online Supplier