Qinhuangdao Zhendi New Material Technology Co. LTD

Online Supplier

Business Type: Manufacturer

Main Products:Fiberglass sheetFiberglass wall panelfiberglass roof sheetfiberglass decorative panelFiberglass embossed panelFiberglass trimsfiberglass truck body panelfiberglass sandwich panelfiberglass composite panel

View on mobile

3mm thickness gel coat Fiberglass cooling tower sheet for wall

ID:22111089577

Construction & Decoration Building Structural Material

FOB Price:US$ 3.500 / Square Meter(s)

MOQ:500.00 Square Meter(s)

Product Keywords:

frp cooling tower sheetfrp roof sheetfiberglass roofIndustrial Cooling Towercooling tower sheet

Payment Method:

L/CT/TD/PWestern UnionPaypalMoney GramOthers

Product Category
Construction & Decoration > Building Structural Material
Trademark
ZHENDI
Product Package
Packing in flat
Specification
1.2-4mm*2300mm*11800mm
Place of Origin
Hebei,China
Port
Tianjin port,China
Product Description

1. FRP cooling tower panel is new material for large cooling tower system. It is coated with weathering-proof gel coating, which completely solved the problem of aging and fiber exposure. 2. The advantage of large-scale production. ZHEND's daily output of corrugated panel reaches 3000 square meters, which greatly saves the panel cost, and provide the panel with better quantity and more competitive price. 3. Professional and mature production processing. Benefit from 26-year production experience, ZHEND is relatively experienced FRP application in cooling tower system
Specification
Temperature limit
Commonly -40oC to 60oC
Fireproof rate
B, OI≥26% A ,OI≥30%
Anti-UV
≥99%
Service life
10-20 years
Light Transmittance
Opaque
Color
RAL Color Card
Width
300-3200mm
Length
Customized
Surface
Shiny on One Side
the Other Side
Smooth or Rough
Gel coating obtained by surface treatment of a glass reinforced plastic laminated material with a special resin known commercially as a gel coating.
Fiberglass gel coating sheet with high UV-resistance, corrosion resistance and long service life. The exterior surface is brighter and the color is brighter. It is widely used in cooling tower panels and body winding corrosive products plant.
Application
Product packaging
Corrosion resistance cooling tower FRP panel
Packing
1. Protected by stretch film;
2. Fasten by packing banding and packed on pallet;
Delivery
1. Stock profile: 3-5 working days.
2. Manufacturing: 1-2 weeks, or depends on the order quantity.
ZHEND‘s Advantage
We introduced two advanced production lines with Max. width 1500mm and 3200mm, the annual production capacity is about 3,000,000 square meters. Combining with a professional sales team, we have developed a number of patents and approved by the certificate ISO 9001:2015. With years of scientific supervision machanism and high quality product pursuit, Zhendi will consistent to devote ourselves to the customer service and product quality, to provide the world with better "Made-in-China" and "Made-in-Zhend".
Exhibition and Certificate

2020 in Shanghai

2019 in France

2018 in Russia

FAQ of ZHEND
Q: Are you trading company or manufacturer ?
A: We are factory. Certainly if you need other special product, we will do our best to help you, so we can build a long-term
business relationship.

Q: Can I order the product with special size?
A: Of course you can, also we will produce the products according to your detail requests.

Q: How many years experience do you have in this industry ?
A: Our factory was established in 1999, thanks for 21 years development, our design and production team became stronger and stronger. By now we have became the fist large scale enterprise on this field.

Q: Why we are your best choice?
A: We have direct factory and many years of export experience, and offer the best price with high quality product, timely
delivery, also have good after-sales service, therefore with good reputation on boards and with many clients have good long-term business relationship.

Q:What's the Payment Terms?
A: 30% T/T as deposit, balanced before shippment arranged. We'll show you the photos of the products and packages before you pay the balance. T/T, L/C, Western Union acceptable...Other way can be negotiated.
   
Q:What about your delivery time? Can we receive the goods on time ?
A: Usually around 3-5 weeks after order confirmed, it also depends on the total quantity of your order. During the production process, we will report the production progress to you at any time.
   
Q:How to guarantee the products I bought?
A:We will offer TDS for each item before delivery. Any quality problem, customer provide samples/pictures/test data, once
   confirmed, exchange or other ways as you like.


Qinhuangdao Zhendi New Material Technology Co. LTD

Business Type:Manufacturer

Online Supplier