
Business Type: Manufacturer
Main Products:door sealMechanical rubber productsCabinet Rubber SealsSponge rubber sealDoor and window sealSpiral wrapsSilicone RubberMolded Rubber PartsEPDM rubber door sealexhaust rubber hose
ID:20120446057
Category: Auto,Parts & Accessories Automotive & Parts
MOQ:100.00 Meter(s)
Rubber Door Sealrubber sealepdm rubber sealseal stripauto door seal strips auto door seal stripscar door rubber seal stripdoor rubber seal
L/CT/TD/PWestern UnionMoney Gram

| Product name: | Co-extruded Rubber Seals( PVC+Epdm) |
| Material: | EPDM/PVC shipping container door seal |
| Color: | Brown and Black can be customized |
| Feedback: | Inquiries will be dealed with in 24h |
| Function: | fireproof |
| Packaging: | Shipping container door seal plastic bags inside, carton boxes outside or OEM |
| Application: | Other Door & Window Accessories,Construction industry |
| Lead time: | 7-15work days after order confirmed for MOQ |
Advantages
1.We have our own factory,so the price can be competitive
2.we win by the high quality and then have a long-term business relationship.
3.Specification according to customer's requirment.
4.Samples & drawing are accepted











FAQ
Q 1. What's the payment term?
A: We accept T/T 30% deposit and 70% balance against copy of B/L or L/C at sight, West Union,VISA,Paypal is also accepted.
Q 2. What is the normal lead time for product orders?
A: Average lead times for prototype / first article are 1-2 weeks, if tooling is involved, lead time for production tooling is 10 days, average production time after sample approval is 2-3 weeks.
Q 3. What is your standard packing?
A: All the goods will be packed by carton box and loaded with pallets. Special packing method can be accepted when needed.
Q 4. Could you please tell us the month capacity of your products ?
A: It depends on which model, we produce more than 2000 tons rubber materials per month.
Q 5.How to get a price?
A: Pls make sure your size and qty., if you have drawings or sample,would be much better.
we can also supply special service, such as cut pieces, drill hole, packing, etc. Pls let us know.
Q 6.How long get the goods?
A: We will be responsible to any product damage caused on delivery.
Regards to the delivery, we have the fastest delivery time for this kind rubber, because we have professional production process, usually, it need less than 15 days before deliver the goods.

Business Type:Manufacturer
Online Supplier